ABOUT THE PROJECT

Why is the Nakkaş-Başakşehir Motorway Project needed?

The Nakkaş-Başakşehir Motorway Project will,

• Shorten the distance to the motorway network that links Anatolia to Europe over the Marmara Region. Thanks to the integration of the Project to the motorway network, travel times between large cities of the Aegean and Central Anatolian regions and Istanbul will be considerably reduced,

• Increase service quality and road safety by separating the transit traffic from local traffic which has concentrated around main arteries on East-West axis as a consequence of urbanization and industrialization in the Northern Marmara Region,

• Divert to the Northern Marmara Motorway without drawing into the city of Istanbul the dense traffic caused by heavy vehicles that use TEM O3, Fatih Sultan Mehmet Bridge and D-100 highways,

• Speed up the access to market of goods and services by easing the transportation problems of the industrial zones along the motorway route, thus will contribute to the development of industry investments in the Marmara Region,

• Accelerate the integration of residents of the burgeoning Arnavutköy, Avcılar, Başakşehir and Çatalca districts into the economic and social life of Istanbul, will facilitate their access to Başakşehir Pine and Sakura City Hospital and Atatürk Olympic Stadium,

• In addition to such direct effects, will contribute to decreasing the number of traffic accidents owing to high road standards that provide safe driving, will reduce economic losses such as high fuel consumption, vehicle maintenance and repair costs, and will play a role in lowering greenhouse gas emissions.

Important Aspects of the Project

 The Project stands out as a part of the activities to alleviate the traffic burden in the region.

  • Among the significant components of the Project is a cable-stayed bridge with a length of 1,619 m including its approach viaducts as well as five viaducts with a combined length of 6,021 m.
  • The width of the motorway’s main section is designed as four lanes (2x4) in each direction and the connection roads as three lanes (2x3) in each direction.
  • The most advanced toll collection systems used in the Project will enable fast passage at toll-collection points. The cable-stayed bridge, junctions and toll-collection points will be equipped with high energy-efficiency LED illumination technology.
  • The Project, which does not include service stations or rest areas, will have one maintenance center for the cable-stayed bridge traversing Sazlidere and one maintenance-operation center. These facilities will also be used for active invervention to the emergency situations on the motorway.