RSS
Cable-stayed Bridge Wind Tunnel Tests 28 July 2022
Within the Northern Marmara Motorway Project; the bridge, which will be constructed with the cable-stayed method and planned to have a main span of 440m, side spans of 210m and a total length of 860m, shall cut the Sazlıdere Dam basin on an east-west axis. Due to its location, the bridge shall continue its life cycle under the influence of north-south oriented Poyraz (Northeaster) and Lodos (Southwester) winds, which are critical for Istanbul.
[More]
