At the last section of Northern Marmara Motorway (NMM), which was initiated and the first seven sections of which was opened to service by General Directorate of Highways (KGM), a department of Ministry of Transportation and Infrastructure of Republic of Turkey, the Nakkas - Başakşehir Motorway Project is located. The Project has a main alignment of 24,17 km and includes connection roads and junctions.
KGM has initiated a bid to design, finance, construct and operate the Project with a Build-Operate-Transfer method. Thereby, a contract was signed with Nakkaş Motorway Investment and Management Inc. on 13 April 2021. Nakkaş Motorway Investment and Management Inc. will transfer to KGM all parts of the motorway after a period of 20 years including construction and operation phases.
|
Project name |
Construction, Operation and Transfer of the Northern Marmara Motorway (including the 3rd Bosphorus Bridge) Project Nakkaş – Başakşehir Section (Including the Connection Roads) with the Build-Operate-Transfer (BOT) Model |
|---|---|
|
Administration |
Directorate General of Highways |
|
Consultant |
APCO -Altaş Joint Venture |
|
Appointed Company |
Nakkaş Motorway Investment and Management Inc. (Nakkaş Otoyol Yatırım ve İşletme A.Ş.) |