NAKKAŞ MOTORWAY
CORPORATE
ABOUT US
OCCUPATIONAL HEALTH AND SAFETY & ENVIRONMENT
ENVIRONMENTAL AND SOCIAL RESPONSIBILITY
QUALITY
CERTIFICATES
PROJECT OVERVIEW
ABOUT THE PROJECT
ROUTE
IMAGES
NEWS
ENVIRONMENTAL & SOCIAL MANAGEMENT
CONTACT
TÜRKÇE
TR
EN
Files
HOME
›
ENVIRONMENTAL & SOCIAL MANAGEMENT
›
Files
›
ESIA & Annexes
ESIA
Annex
Annex 1 Design Change Management Procedure
Annex 2 EHSS Legal Register
Annex 3 EIA Exemption Letter
Annex 4 International Conventions Ratified by Turkey
Annex 5 Studies of Quarries, Campsites and Production Plants
Annex 6 Air Quality Baseline Study
Annex 7 Soil Sampling Analysis Report
Annex 8 Licensed Waste Facilities
Annex 9 Surface Water Analysis Report
Noise Baseline Study
Annex 11 CHA & Biodiversity Surveys
Stayed Cable Bridge Risk of Collision Impact to Birds
Fauna Species List
Flora and Vegetation
Report on Fauna Studies
Critical Habitat Assessment
Bird Surveys Report
Bat Surveys Final Report
Annex 12 Stakeholder Engagement Telephonic Interviews
Annex 13 Paris Alignment Study
Annex 14 Environmental and Social Management and Monitoring Plan
Annex 15 Constraint Maps
Annex 16 Flood Risk Assessment
Annex 17 Construction Environmental and Social Management Plan
Non-Technical Summary (NTS)
Non-Technical Summary (NTS)
Stakeholder Engagement Plan (SEP)
Stakeholder Engagement Plan (SEP)
Environmental and Social Action Plan (ESAP)
Nakkas Basaksehir Motorway ESAP
E&S Management Plans
Air Quality ad Emission Control Plan
Biodiversity Action Plan
Habitat Restoration Plan
Blasting Management Plan
Community Health Safety Security Plan
Cultural Heritage Management Plan
Emergency Preparedness and Response Plan
Gender Action Plan
Health and Safety Plan
Labour Management Plan
Landscape Management Plan
Noise and Vibration Management Plan
Pollution Prevention Plan
Supply Chain Management Plan
Supply Chain Management Plan
Appendix 2 Supplier Assessment Framework
Appendix 3 Evaluation Tool
Traffic Management Plan
Waste Management Plan
Wastewater Management Plan
Resettlement Action Plan (RAP)
Resettlement Action Plan (RAP) Clean final 15.08.2023 GEM
Annex 7 - Guide to Land Acquisition and Compensation
ESIA Disclosure Report
Public Consultation and Disclosure Report 2024/0110
✖
Sitemizde, içeriğin tarafınıza sağlanması ve hizmet kalitesinin artırılması için çerezler kullanılmaktadır. Site üzerinde kullanılan çerezler hakkında detaylı bilgi almak için
Çerez Aydınlatma Metni
’ni inceleyebilirsiniz.